Comprehensive energy renovation of the Benicarló Municipal Indoor Swimming Pool

Complete transformation into a nearly zero energy building

We carried out a comprehensive energy renovation of the Benicarló Municipal Indoor Swimming Pool, a municipal sports facility built in 1999 that had been closed since the pandemic due to the deterioration of its facilities and the obsolescence of its technical systems. The project has transformed the building into a highly efficient facility, working towards achieving nearly zero energy consumption (NZEB).

The project, with an investment of 2,408,014.07 euros, has included the complete renovation of the thermal installations through the implementation of high-efficiency aerothermal systems, heat pumps and heat recovery equipment adapted to the high energy demand of an indoor swimming pool.

A 134.1 kWp self-consumption photovoltaic solar installation has been incorporated, consisting of 246 solar panels, with an estimated production of 187,698 kWh/year, aimed at significantly reducing the building's electricity consumption and moving towards its partial self-sufficiency.

The project has been completed with a comprehensive overhaul of the electrical installation, including a new 400 kVA transformer substation, the renewal of switchboards and wiring, and the implementation of high-efficiency LED lighting.

The project also includes improvements to the building envelope through the replacement of windows and glazing, the repair of structural defects, and the modernization of interior spaces, along with bringing the building into compliance with current accessibility regulations. All of this is complemented by the implementation of a centralized energy management system (BMS), which allows for real-time monitoring and optimization of energy consumption.

Project figures

1.648,87m²
built area
2.408.014,07€
Total investment (VAT included)
134,1kWp
Installed photovoltaic power
187.698kWh/year
Estimated energy production
400kVA
Power of the new transformer station

Key project features

  • Comprehensive transformation into a nearly zero energy building (NZEB)
  • Replacement of thermal systems with high-efficiency aerothermal systems
  • Large-scale self-consumption photovoltaic installation
  • Comprehensive renovation of electrical installations, air conditioning and regulatory compliance
  • Implementation of a BMS energy management system and repair of construction pathologies
The transformation of this facility not only allows its reopening, but also makes it a benchmark for energy efficiency and sustainability within municipal sports facilities.
Eva María Fayos Director of the Energy Efficiency and Fire Protection Area