Skip to contentSkip to content
Home Projects Fire Protection Jose Jareño SA — Comprehensive fire protection system for shredder installation

Jose Jareño SA — Comprehensive fire protection system for shredder installation

Early detection and immediate response in a high-risk environment

We developed and implemented a comprehensive fire protection system at an industrial facility dedicated to material fragmentation, located in the El Puig de Santa María industrial park (Valencia). This is a high-risk environment, so the project was designed to guarantee early detection and immediate response to any fire, ensuring the protection of people, machinery, and facilities.

The project includes the implementation of a complete fire detection and suppression system, consisting of an addressable analog fire alarm control panel, automatic detectors, manual call points, and alarm sirens. For fire suppression, a closed-loop hydraulic network has been installed to supply hydrants, fire hose reels, tower hydrants, a fire protection system, a water storage tank, fire extinguishers, and foam tankers.

The system design has been optimized for critical industrial environments, incorporating highly reliable solutions such as hydraulic network redundancy and long-range water projection systems using cannon hydrants. All of this ensures an effective response even in the most demanding operational scenarios.

The project has been developed in coordination between the industrial client, specialized engineering, installation company and PCI system suppliers, integrating criteria of safety, efficiency and regulatory compliance.

Project figures

12.894m²
Protected surface
2.400l/min
Design flow rate
220m³
Tank capacity
22weeks
Implementation period

Key project features

  • Comprehensive fire protection system for high-risk industries
  • Closed-loop hydraulic network for maximum reliability
  • High-sensitivity addressable analog detection
  • Cannon hydrants on towers for reinforced coverage
  • Complete protection of facilities, machinery and personnel
  • Complete PCI detection and extinguishing system
Protecting a high-risk facility is not just about complying with regulations, but about designing a solution capable of responding quickly, reliably, and safely when it is most needed.
Tony Pina Fire Protection Area Manager

Shall we talk about your project?

A specialized team to help you optimize the management of your facilities and services.

Contact us